Client portal ↗
Kalibr Partners
Talk to a partner ↗ Client portal ↗
Outcomes · Case study · Compression · Jonah Energy

Eagle Ford.Six unitsmoved the fleet.

Bringing in a second vendor for six units made the main vendor cut its price on everything else. The same approach a year later, on a fleet three times the size.

01 / The situation

Before and after

The situation

A second purchase. One vendor's fleet.

  • 01A second purchase: 60,000+ horsepower at 29 sites
  • 02One vendor held 90% of the equipment, 95% of the bill
  • 03Equipment 10.2 years old, running 96% of the time
Why Jonah called
  • 01No single contract was big enough to fight over
  • 02The same 90-day window, the same busy team
  • 03It had worked on their last purchase, a year before
The result

A smaller share. A lower bill.

  • ↓$3.9MSaved a year, against what they paid before
  • ↑98%Uptime guaranteed, up from 96%
02 / The evidence

The evidence

The main vendor's share of the bill

One vendor no longer holds the whole fleet.

The main vendor's shareWith twelve moreSelect a mark to inspect
The main vendor's share of the billBefore95%Six new units signed71%With twelve more29%Before the awardOne vendor no longer holds the whole fleet.

01

    From the award record: the main vendor's share of the bill before the award, with the six new units signed, and with the twelve optional units added.

    03 / What we did

    From seven bids to a smaller share.

    01

    Seven vendors bid, each compared on one all-in price

    Seven bids

    Every bid was brought to one all-in price for the same horsepower, so seven offers could be read side by side.

    • Seven vendors
    • All-in price
    02

    Priced the new vendor at the uptime it really delivers

    Uptime-adjusted

    A low rate on equipment that runs less of the time costs more per unit of gas. Each offer was priced at the uptime its vendor delivers.

    • Uptime
    • Cost per unit of gas
    03

    Gave the new vendor six units, twelve more optional

    Six units

    The award was small enough to start at once and large enough to matter. The twelve optional units kept the main vendor's price in play.

    • Six units
    • Twelve optional
    04

    The main vendor cut the price on every unit it kept

    12.7% off

    With a second vendor on site, the main vendor took 12.7% off everything it kept.

    • 12.7% off
    • Every unit kept
    04 / The outcome

    What changed

    12.7% off everything the main vendor kept.

    The cut runs across every unit the main vendor still operates.

    Uptime guarantee raised to 98%, 99% on new units.

    The guarantee rose from the 96% the fleet was running, and the new units carry a higher bar.

    First month free, moving costs paid by the new vendor.

    Bringing in the second vendor cost Jonah nothing to start.

    Smaller units later at no penalty, as wells decline.

    As production falls, units can step down in size without a charge for the change.

    Scope
    • Compression
    • Eagle Ford · South Texas
    • 2026
    • Lower cost, more uptime, debt better covered
    All outcomes ↗

    Bring the cost.We take it out.

    $150MM+ taken out, one category at a time. The first call is with a partner.

    Talk to a partner