Lateral feet a day, by crew and fleet.
Each job's pace and design read at the pad: feet a day, sand and water a day, sand and water per foot, with one fleet followed from pad to pad.
The job priced at the crew's real speed.
Every number carries its source, so your team can stand behind it in the negotiation.
Each job's pace and design read at the pad: feet a day, sand and water a day, sand and water per foot, with one fleet followed from pad to pad.
Pumping at the crew's observed pace, sand delivered to the basin, chemicals by fluid system, pump-down, mobilization and lost time, in dollars per lateral foot.
Demand, supply and tightness by basin, the operator and vendor pairings, and a strength score read from each pumper's fleet mix, utilization and balance sheet.
Pace by provider · DJ Basinlateral feet a day · medians
The slower provider's fleets run from 1,468 to 2,815 feet a day, the faster's from 2,470 to 4,381. Providers unnamed.
One day rate across the basin's band · 10,167-foot well$200,000 a day
Pumping cost alone, at $200,000 a day, the public arithmetic's round and conservative stand. The days are what the bid sheet cannot see.
Two providers, one day rate · the well delivered$ per well
Provider B pumps about 35% faster, and that is the whole difference.
A sample of the frac pack · DJ Basin · as published July 2026Providers unnamed
Each pumping company's crews ranked on observed pace in the basin and formation against their peers, with a percentile for every job and a composite score the reader weights.
Six providers benchmarked on hundreds to thousands of jobs each, deep enough that the percentiles mean something.
The cost of a frac job built up in dollars per lateral foot: pumping at the crew's observed pace, sand delivered to the basin, chemicals by fluid system, pump-down, mobilization and lost time. Two modes: the vendor's typical job here, or this job's design priced for every bidder.
A floor, in dollars per foot. Bids sit above it by the vendor's margin, and the margin moves with the market.
Demand is the jobs operators drive; supply is the distinct fleets vendors deploy; tightness is the trend in jobs per fleet. Both sides' concentration, and which vendors work for which operators, read from the same jobs.
Each basin read on its own, where a national average would hide the difference.
A score for each pumping company from the share of next-generation fleets it runs, how hard its fleets work, its diesel exposure and the leverage on its balance sheet, so a low bid is weighed against the vendor behind it.
Pace sits beside fleet modernization and leverage, so a buyer weighs price against the counterparty.
A basin-by-basin forecast of frac demand driven by the oil and gas futures strip, rerun with each forecast. A falling outlook feeds the cost escalator in the should-cost model.
Where the work is going, read off the futures curve before the bids arrive.
Every read on this page comes from one job record, rebuilt weekly from public filings. It reaches your team in the client portal, and it reaches your own agents and workflow through an API and an MCP server they call directly, read only.
Which crew should we book for the DJ program, and what should the job cost?
Book Provider B. It pumps about 35% faster than Provider A, so the same day rate delivers the well for $635,835 against $860,881, 26% less. Price the bid at that pace and write pump time into the contract.
Ask about a crew, a basin or your bids
Scripted example · sample data from the frac pack · providers unnamed
The pack on a corporate licence that covers every seat on the team, with the portal, the API and the MCP server. Pricing is shared on request.
Request pricing ↗Ask for one basin and we send real rows from the pack: job, pad, provider, pace and design, scope stated.
Request a sample ↗Every frac disclosure in the FracFocus registry, joined to state well records and attributed to the company that pumped the job. Refreshed weekly; the latest two quarters are preliminary.
$17.5M a year saved on frac, about 25% of the 2025 frac budget, with pump time in the contract.
The case ↗$8.7M a year saved on sand, about 14% off the program, with the railroad negotiated first.
The case ↗The frac read is written up first on Substack: the crew behind the bid, the market that retired the cheap fleet, and the contract that pays on pump time.
It leaves out how fast the crew pumps, the one number that makes bids comparable. Which we have. Ahead of Q3 RFPs.
Read on Substack ↗They Scrapped the Cheap Fleet and Filed an 8-K About It.
Read on Substack ↗Why the industry’s favorite efficiency lever won’t fix the one cost it never measures.
Read on Substack ↗$150MM+ taken out, one category at a time. The first call is with a partner.