Client portal ↗
Kalibr Partners
Talk to a partner ↗ Client portal ↗
Outcomes · Case study · Frac · Rockies private E&P

Rockies.Frac, paidon performance.

They feared a new frac vendor would cost them basin-leading performance. Paying on performance made the switch safe. Before you renew a frac vendor, check the market and put performance in the contract.

01 / The situation

Before and after

The situation

A renewal. No bid planned.

  • 01The frac vendor was about to be renewed for 2025
  • 02No bid planned: the renewal rested on past performance
  • 03The team feared giving up basin-leading performance
Why they called
  • 01The market had moved, and nobody had checked
  • 02Frac is one of the largest costs in a new well
  • 03No way to compare vendors on speed, safety and price
The result

A new vendor. Performance in writing.

  • ↓$17.5MA year saved on frac
  • ↓25%Of the 2025 frac budget, about
02 / The evidence

The evidence

What the contract pays on

The vendor's pay is tied to how much of the time its pumps are working: a written floor at 85%, and a bonus for beating 95% in a quarter.

Pump timeThe bonus lineThe floorSelect a mark to inspect
What the contract pays on80%85%90%95%100%Pump timeAt least 85%, in writingA 3% bonus above 95%Crews and partsMaintenance crews around the clock, spare parts on site.The move and the exitThe vendor pays to move in, with a 60-day exit window.The contract, as signedPaying on performance made the switch safe.

01

    The terms as the deck states them, drawn on a pump-time scale from 80 to 100%.

    03 / What we did

    From the crews to the contract.

    01

    Compared frac crews on speed, downtime and safety

    Crew by crew

    Every frac job was read by crew and quarter, so each vendor's crews could be scored on speed, downtime and safety.

    • Speed
    • Downtime
    • Safety
    02

    Showed how much each vendor needed this operator's work

    Vendor appetite

    Each vendor's appetite for the operator's program was read before the bid went out.

    • Vendor appetite
    03

    Built each bid's should-cost before the first round

    Should-cost

    Each bid was rebuilt from its parts, the crew's pace on these wells, sand, fuel and the move to location, so the margin inside every bid was known before the first round.

    • Cost floor
    • Margin by bid
    04

    Ran a bid that scored total cost, not just the price

    Total cost

    Bids were scored on what a well would cost with each crew's real speed and downtime, as well as the price on the quote.

    • Total cost scoring
    05

    Negotiated the switch, with performance in the contract

    Performance terms

    The new vendor's pay was tied to pump time, with a floor in writing and a bonus above it.

    • Pump time
    • Floor and bonus
    04 / The outcome

    What changed

    Pumps working at least 85% of the time, in writing.

    The floor is in the contract itself, which answered the fear of losing basin-leading performance.

    A 3% bonus when the vendor beats 95% in a quarter.

    The vendor earns more only when the operator's wells get more pump time.

    Maintenance crews around the clock, spare parts on site.

    Downtime is handled at the location, with the vendor's people and parts.

    The vendor pays to move in, with a 60-day exit window.

    The switch cost the operator nothing to start, and it can leave within 60 days.

    Scope
    • Frac (well completions)
    • Rockies
    • 2025
    • Well capital cost (AFE)
    All outcomes ↗

    Bring the cost.We take it out.

    $150MM+ taken out, one category at a time. The first call is with a partner.

    Talk to a partner