Outcomes · Case study · Frac sand · Rockies private E&P

Rockies.The railroadfirst.

The rail bill kept outside sand from competing. We negotiated the railroad first, then cut the cost of both sources. The cost everyone treats as fixed is often the place to start.

01 / The situation

Before and after

The situation

One local source. A costly rail bill.

  • 01The operator buys its own sand, apart from the frac vendor
  • 02Local sand was priced well, but came from one source
  • 03Outside sand was priced well, until the rail bill
Why they called
  • 01They did not want their supply tied to one source
  • 02Rail made outside sand cost more than local sand
  • 03Nobody had tested the rail rate
The result

Two sources. Both cheaper.

  • ↓$8.7MA year saved on sand
  • ↓14%Off the sand program, about
02 / The evidence

The evidence

The order that made it work

The railroad came first. With its rate down, outside mines could compete at the well, and each source was used to bring the other's price down.

The sequenceThe railroad, firstSelect a mark to inspect
The order that made it work1The railroadConcessions, about15% off the rate2Mines outside the basinNow competitive,delivered to the well3Local and outside minesEach used to bringthe other's price downOne local sourceMore than one source of sand

01

    The sequence as it was run. Each step changed the price the next one could be asked for.

    03 / What we did

    The railroad, then the mines.

    01

    Went to the railroad first, and won concessions

    About 15% off

    The rail rate was the cost nobody had tested. The railroad conceded about 15% off it.

    • Rail rate
    • About 15% off
    02

    That made sand from outside the basin competitive

    Outside mines

    With the rail rate down, sand from mines outside the basin could compete, delivered to the well.

    • Delivered price
    03

    Used the new option as leverage on the local mines

    Local mines

    The local mines were negotiated last, against a real alternative for the first time.

    • Sequenced last
    04

    Brought the cost of both sources down

    Both sources

    Each source was used to bring the other's price down, and the program came out about 14% cheaper.

    • $8.7M a year
    • About 14%
    04 / The outcome

    What changed

    $8.7M a year, about 14% off the sand program.

    The saving came from both sources, local and outside, after the rail rate moved.

    More than one source of sand.

    Supply no longer rests on a single local mine.

    Lower cost from local and outside mines alike.

    Each source now prices against the other.

    An order of negotiation they can run again.

    Railroad first, then the outside mines, then the local ones: the sequence works on the next contract too.

    Scope
    • Frac sand
    • Rockies
    • 2025
    • Well capital cost (AFE)
    All outcomes ↗