Client portal ↗
Kalibr Partners
Talk to a partner ↗ Client portal ↗
Outcomes · Case study · Production chemicals · Rockies private E&P

Rockies.The surcharge,rejected.

One of the world's largest oilfield service companies asked for 10% more. We checked the math, and it was rejected. Before you pay a vendor's increase, we check it against real costs.

01 / The situation

Before and after

The situation

A 10% surcharge. No way to check it.

  • 01The chemical vendor added 10% to every invoice line
  • 02The reason given: a conflict overseas raised its costs
  • 03One vendor, exclusive, under contract through 2027
Why they called
  • 01No way to check the vendor's cost claim from the invoice
  • 02Switching chemical vendors on producing wells is risky
  • 03Surcharges go up fast and come down slowly, if at all
The result

The claim checked. The surcharge rejected.

  • ↓$384KA year avoided, on a $3.8M program
  • ↓10%The surcharge claimed, and rejected
02 / The evidence

The evidence

What the costs justified

About 6% on average · seven of nine too high

Justified by the costs10% claimedAbout 6% on averageSelect a mark to inspect
What the costs justified · 10% claimed0%4%8%12%16%Silicone inhibitors3.1%Paraffin3.4%Acid and corrosion4.2%Scale5.3%Corrosion5.4%Emulsion breakers5.6%Biocides6.5%H2S scavengers9.1%Hydrate inhibitors14.0%10% claimedAbout 6% on averageNine chemical linesAbout 6% on average · seven of nine too high

01

    Each bar is a chemical category, priced from its raw materials on public market data. The scale runs to 16%.

    03 / What we did

    From the invoice to the raw materials.

    01

    Broke each chemical down to its raw materials

    Nine categories

    Each of the nine chemical categories on the invoice was taken apart into the raw materials it is made from.

    • Nine categories
    • Raw materials
    02

    Priced each raw material on public market data

    Public prices

    Every raw material was priced on public market data, so the cost of each line could be rebuilt without the vendor's figures.

    • Public market data
    03

    Agreed the two real increases, refused the blanket 10%

    Two agreed

    Where the costs had risen, the increase was accepted. The 10% on every line was refused.

    • Two increases agreed
    • 10% refused
    04

    Gave the vendor two better offers than its surcharge

    Two offers

    Two offers went back to the vendor in place of the surcharge, and the 10% was rejected.

    • Two offers
    04 / The outcome

    What changed

    The 10% surcharge rejected.

    The blanket increase came off every invoice line.

    $384K a year avoided on a $3.8M program.

    The figure is what the 10% would have added over a year.

    A cost model the team keeps for the next increase.

    The next surcharge can be checked against the same raw-material prices, by the team itself.

    Fourteen hours of our time, charged to LOE.

    The work was billed by the hour and charged to lease operating expense.

    Scope
    • Production chemicals
    • Rockies
    • 2026
    • LOE, the chemical line
    All outcomes ↗

    Bring the cost.We take it out.

    $150MM+ taken out, one category at a time. The first call is with a partner.

    Talk to a partner